Vertiport Power-Readiness
Aircraft certification gets the headlines. Power decides whether a vertiport opens on time. Grid Pass Group plans and builds the electrical infrastructure vertiports, airports and FBOs need for eVTOL charging, from the first power study to energization.
Charger-neutral. Built for Los Angeles and beyond.
One hand to shake, from concept to commissioning.
What we deliver
Power-readiness studies: how much power the site needs, what the utility can deliver, and when.
Megawatt-class charging infrastructure: switchgear, transformers and charging built to your aircraft partner's standard. We stay charger-neutral.
Battery buffering: on-site storage that cuts peak demand and can shrink or delay costly utility upgrades.
Permitting and utility coordination: every authority having jurisdiction, airport stakeholders and the utility, from application to energization.
Shared infrastructure: one substation serving a vertiport, data center and EV hub together, where one accountable integrator matters most.
How it works
1. Study. A power-readiness study tells you how much power the site needs, what the utility can deliver, and the fastest path to energization.
2. Design-build. We design, procure, permit, build and commission the electrical infrastructure as one accountable integrator.
3. Operate. Monitoring and maintenance keep charging available when aircraft need it.
Planning a vertiport for LA28 or beyond?
Start with a power-readiness study before the utility timeline decides your opening date.